Colombia

Torre Project. Complete cement plant. Colombia

Turnkey EPC project for the construction of a complete cement plant with a production capacity of 3,150 t/day of clinker and approximately 1.5 million t/year.

The plant design includes mechanical systems for the handling of solids for receiving raw material, primary crushing, rawmix silo and mill, pyroprocessing, clinker cooler and silo, as well as the installation of a cement mill, silo, dispatch, bagging and palletizing equipment. A coal mill will make it possible to use the ground coal in the calciner and main burner of the clinker kiln.

The installation uses the technology and design known as State of the art; and in the selection of the process and the design of the cement factory, the objective was to obtain a reliable plant, that is easy to operate and with low operating costs. It is also characterized by its adaptability to local conditions.